Contemporary Manchester office interior with charcoal roller blinds across the windows

Commercial blinds · North West and UK projects

Commercial blinds,specified and fitted

Commercial and contract blinds for facilities managers, contractors, architects, schools, care groups and managed buildings.

Building typeStart with the setting SitesOne site or a wider estate WindowsAn estimate is enough ProgrammeA date, if you have one

Selected commercial work

Who we work for

Named projects from civic, office and education settings, with the installation detail available in each case study.

Completed commercial projects

  • Manchester Town Hall
  • DWP Salford
  • Stockport School
  • Dalkia
  • North West Ambulance Service
  • Oldham Athletic Football Club

Verified credentials

Evidence your procurement team can check

See the key cover, accreditations and site competencies now. Expand the full record when you need the detail.

Tell us about your site

Constructionline Gold, BBSA accredited and Yewdale Kestrel certified installers

Trade accreditations
£5m Public and products liability
£10m Employers' liability

Qualified site team

Enhanced DBS across the fitting team

RAMS supplied as standard before works begin

View full compliance details Insurance, training, access and site controls
Public and products liability
£5,000,000
Employers' liability
£10,000,000 for any one claim
Insurer
Aviva Insurance Limited
Valid until 5 February 2027
Accreditations
Constructionline Gold, BBSA accredited and Yewdale Kestrel certified installers
BBSA member page
Anti-ligature
Yewdale Kestrel certified installers across the fitting team, renewed annually
Valid until 24 June 2027
Site team
CSCS carded, with our own SSSTS qualified supervision
Safeguarding
Enhanced DBS across the fitting team
Training and access
IPAF, PASMA, Working at Height, Asbestos Awareness and face fit testing
Safety management
Laura Pinder holds IOSH Managing Safely
Risk assessment and method statement
RAMS supplied as standard before works begin
Child safety
BS EN 13120 devices fitted and adjusted on every unit
Typical lead time
7 to 10 days from survey to installation
Checkatrade rating
9.83 / 10
Checkatrade profile

Case studies

Work you can inspect

Compare completed BBS installations across different buildings, briefs and programmes.

See all project work

Specification

Before you specify it

The answers a specifier, facilities manager or main contractor needs before our blinds go anywhere near your building.

Fabric and fire
Yewdale contract fabrics certified to BS 5867 Part 2 Type B, with the certificate for the specified fabric supplied on every commercial order. A Type C certified fabric is available where the specification calls for it.
Child safety
Devices to BS EN 13120 are fitted and adjusted on every unit, with chains and cords secured at the correct height. Mandatory in schools, nurseries and care settings.
Fixings and substrate
Self-drilling fixings into aluminium frames. Rated cavity anchors in plasterboard, or hardened screws where a stud is confirmed. Masonry drilling uses on-tool HEPA extraction and face fit tested P3 masks.
Working at height
EN 131 professional access equipment, inspected and tagged before use. Two fitters, one working and one at ground level watching the area below. IPAF and PASMA carded for powered access and towers.
Occupied buildings
We ask to see the asbestos register at induction before anyone drills, and we stop and check rather than guess on any material the register does not cover.
Getting it done
Seven to ten days from survey to fitting, and we work around your hours. Project specific RAMS come to you before we start.

Ask for the certificate on the fabric you are specifying and it comes with the quote. Download our generic example RAMS , or see the full insurance, accreditations and RAMS page for your PQQ.

How a project moves

From enquiry to sign-off

Start with what you know. The brief can be refined as drawings, access and programme become clearer.

  1. 01

    Enquiry

    Tell us the building, a rough window count and when you need it.

  2. 02

    Survey and schedule

    We review the brief, drawings and access requirements, then agree what needs measuring.

  3. 03

    Project documents and programme

    Scope, products, programme and any requested project information are agreed before fitting.

  4. 04

    Fit and sign-off

    Installation is completed against the agreed schedule, with any snags recorded at sign-off.

Start the commercial enquiry

Lifecycle and planned replacement

Programmed replacement across an estate

Blinds reach end of life across a whole building, not one window at a time. If you are budgeting a lifecycle or planned maintenance programme, we work the way your programme does.

  • Priced by phase, not by guess

    Survey the full estate, then price it in the phases your budget releases. Each phase stands on its own purchase order.

  • Installed in the window you have

    Summer and half-term holidays for schools, out of hours and weekends for occupied workplaces. We plan around the building being in use, not the other way round.

  • Working under a main contractor

    We work to your induction and site rules, attend pre-start meetings, and supply RAMS before anyone is on site. Two operatives at height, one as ground level observer.

  • Consistent across every phase

    The same fabric, the same system and the same control type in year three as in year one, so a replaced floor matches the one above it.

Recent lifecycle work includes school and academy estates across Greater Manchester, Cheshire and Merseyside, instructed by a Tier 1 facilities management contractor and delivered inside a two to three day holiday window.

See the lifecycle replacement programme Price a lifecycle programme

Contract curtains and subcontract fitting

One supplier for blinds and curtains, working under your programme.

BBS supplies and fits contract curtains alongside blinds, so a fit out does not need two window dressing subcontractors. At Cale Cross that was curtains and roller blinds to around 241 apartments over 17 floors for Oak Construction, plus the cinema room and private dining.

We work as a subcontractor to main contractors, fit out firms and FM providers: RAMS per site, inductions and pre-start meetings attended, a PO reference carried through to invoice, and fitting sequenced to your handover dates. For the right job we travel: Cale Cross in Newcastle, Keady's head office in Kent and Skinner Street in Leeds were all BBS installations. See the facilities management page for how reactive and planned work runs across an estate.

Aerial view across central Manchester and its surrounding districts

Coverage

North West based. UK commercial coverage.

Residential fitting stays in the North West. Commercial fit-out and larger directly managed projects can be delivered across the UK, depending on scope.

Explore all coverage

Commercial enquiry

Tell us what you are pricing

Give us the building type, a rough window count and when you need it, then where to send the quote. Site counts, drawings and tender dates go in the optional project detail.

0161 244 9467 Call to discuss the brief

Prefer to choose how you get in touch? Contact BBS.

Useful if you have them Site postcodes Window schedule or drawings Tender deadline, if applicable

Commercial enquiry

Tell us about your site

Step 1 of 2. About 30 seconds.

  1. 1The job
  2. 2Your details
About the job
What kind of building is it?
Roughly how many windows?
When do you need them?
Where do we send the quote?
Add project detail Optional. Tenders, fire retardant fabric, access, drawings.
What kind of project is it?
Number of sites
Specification stage
Products, if known
Do you need a certified fire retardant fabric?
Access requirements
Tick anything you need from us before we can start