Three burgundy roller blinds fitted above a bay of tall white sash windows in a Stockport School classroom, playing field beyond

Commercial project · Stockport

Stockport School classroom, science lab and sports hall blinds

Burgundy roller blinds fitted through classrooms, science labs and the sports hall, worked room by room while the school was empty for the summer.

Client
Stockport School
Setting
Classrooms, science labs and sports hall
Location
Stockport

Project facts

The job at a glance.

Client
Stockport School
Setting
Classrooms, science labs and sports hall
Location
Stockport
Classrooms
10 rooms
Sports hall
14 blinds
Installation
Three working days
Burgundy blinds fitted high into the roof steelwork above the wall bars in the Stockport School sports hall

The brief

What the site needed.

Stockport School had one job with two very different halves. Ten refurbished classrooms and the science labs needed simple, everyday control on tall period-style windows. The sports hall needed something else entirely: glare knocked off the court from glazing sitting high in the roof steelwork.

BBS supplied and fitted roller blinds throughout, using a single burgundy fabric so every room reads the same and the finish ties in with the school colours. The classrooms and labs are crank operated, which is the control a teacher can use without thinking about it. The sports hall took fourteen large format motorised blackout blinds, fitted high into the steelwork where nobody is going to reach a chain.

Where a classroom wall carries several windows in a run, the blinds were set to a matching drop, so light control across the wall is even rather than stepped.

The work went through room by room while the building was empty for the summer holidays, from the ground floor classrooms right up into the sports hall, with snagging and final adjustment inside the three-day programme. Supplied, fitted and delivered on time by BBS’s own fully employed installation team, all Enhanced DBS.

What we did

A specification shaped around the setting.

  1. 01

    Classrooms and labs

    Crank-operated roller blinds fitted to the tall period-style windows in ten refurbished teaching rooms and the science labs.

  2. 02

    Sports hall

    Fourteen large format motorised blackout blinds fitted high into the steelwork to control glare on the court below.

  3. 03

    Fabric

    One burgundy fabric used throughout, chosen to tie in with the school colours.

  4. 04

    Multi-window runs

    Blinds on multi-window classroom walls were set to a matching drop so light control is even across the whole run.

  5. 05

    Completion

    Installation, snagging and fine-tuning within three working days.

A run of burgundy roller blinds set to a matching drop along a Stockport School science lab Roller blinds / Motorised blackout blinds

Working on site

Planned around the building, not just the windows.

  1. 01

    Prepare two systems

    Classroom and high-level sports hall requirements were organised separately.

  2. 02

    Work the empty building

    Rooms were taken in order through the summer holidays, from the ground floor classrooms up into the sports hall.

  3. 03

    Install

    Crank-operated and motorised blind systems were fitted in their respective areas.

  4. 04

    Fine tune

    The programme included snagging and final adjustment of the completed systems.

The result

What changed for the space.

The school opened for September with practical manual control in classrooms and science labs, motorised blackout on the high sports hall glazing, and one burgundy fabric giving every room the same finish.

  • One burgundy fabric across every room fitted
  • High-level sports hall glazing operated remotely
  • Room by room through the holidays, ready for September

Commercial enquiry

Get a quote for work like this.

Tell us the setting, approximate window count and programme. We have already selected the closest project type and size from this case study.

Call 0161 244 9467 Discuss the site brief WhatsApp your site details Send photos, a schedule or the first question

About 90 seconds. Known project context is already selected.

Commercial enquiry

Tell us about your site

Step 1 of 4. About 90 seconds.

  1. 1Project
  2. 2Size
  3. 3Timing
  4. 4Contact
What kind of building is it?
What kind of project is it?
How big is it?
Number of sites
Approximate window count
Products, if known
Do you need a certified fire retardant fabric?
When, and how do we get in?
Timescale
Specification stage
Access requirements
Tick anything you need from us before we can start