Constructionline Gold and BBSA accredited
Trade accreditationsFor your home
For a business or managed building
Gym blinds | Manchester and the North West
Glare off the equipment, privacy in changing and treatment rooms, and materials that cope with wet zones and long opening hours.
Proven in sport and leisure
These published projects cover a football stadium and a school sports hall, with the installed product and setting recorded in each case study.
See all commercial work
Room by room
Reception, a mirrored studio, a pool-side room and a treatment room should not get the same blind. We fit each zone for what happens in it.
Screen fabric that takes the direct glare off equipment and screens while keeping the floor bright.
Dimming, blackout or privacy fabric depending on the classes held in the room, on controls an instructor can reach.
Privacy from outside and from corridors, with fabrics that stand up to ventilation and daily cleaning.
Moisture-resistant materials and mechanisms, chosen before anything is shortlisted, so nothing corrodes or warps.
Procurement
Tell us about opening hours, cleaning blocks and the wet and dry zones. We choose fabrics and mechanisms that suit each one and bring the evidence your operator or landlord asks for.
The asbestos register is checked at induction before any drilling. Work stops if textured coatings, casings or other materials are unconfirmed.
On-tool HEPA extraction is carried for masonry drilling. Operatives using P3 RPE were face fit tested in July 2026.
EN 131 professional step ladders are inspected and tagged through the access equipment log.
Two operatives attend: one at height and one acting as the ground-level safety observer.
BS EN 13120 child safety devices are fitted and adjusted on every unit.
Yewdale contract fabrics certified to BS 5867 Part 2 Type B, with the certificate for the specified fabric supplied on every commercial order. A Type C certified fabric is available where the specification calls for it.
The site pack references training matrix BBS-TM-001, tool register BBS-TL-001 and dust and RPE rule BBS-COSHH-003.
Verified credentials
The essentials are visible here. Open the full record for insurance, training, access and site controls.
Add requirements to your enquiry
Constructionline Gold and BBSA accredited
Trade accreditationsQualified site team
Enhanced DBS across the fitting team
RAMS supplied as standard before works begin
Access and programme
We use the timetable to find room groups we can work in, rather than asking for the whole centre to close.
Reception, gym floor, studios, changing, pool and staff rooms are taken as separate groups.
Tell us the classes, cleaning blocks and busiest member periods and we plan around them.
Barriers, equipment moves and which rooms stay open are agreed with the duty manager before we start.
Each zone is checked and signed off before it goes back to members.
Questions for this setting
Photographs, ventilation details and a clear note of which windows sit inside the humid zone help separate those openings from ordinary dry rooms.
Yes. Tell us what happens in each studio and we spec it for that, whether it needs dimming, blackout, privacy or screen visibility.
Screen and blackout fabrics from the Yewdale contract range are certified to BS 5867 Part 2 Type B, with the certificate supplied on every commercial order, and they wipe down as part of the cleaning routine.
Yes. We work around your hours, supply RAMS before we start, and typically fit within 7 to 10 days of the survey.
Commercial enquiry
Start with the site count, rough window count and programme. Drawings and window schedules can be attached at the final step.
Call 0161 244 9467 Discuss the site briefAbout 90 seconds. Your sector is already selected.
One site, one office or one shop? Skip the form.
WhatsApp the window count A photo of the windows helps