Constructionline Gold, BBSA accredited and Yewdale Kestrel certified installers
Trade accreditations
Gym blinds | Manchester and the North West
Blinds for gyms and leisure centres
Glare off the equipment, privacy in changing and treatment rooms, and materials that cope with wet zones and long opening hours.
- Training spaces
- Glare and screen visibility
- Wet zones
- Moisture considered by room type
- Opening hours
- Access planned around members
Proven in sport and leisure
Leisure work you can inspect
These published projects cover a football stadium and a school sports hall, with the installed product and setting recorded in each case study.
See all commercial work
Room by room
The right blind for each zone
Reception, a mirrored studio, a pool-side room and a treatment room should not get the same blind. We fit each zone for what happens in it.
- 01
Gym floor
Screen fabric that takes the direct glare off equipment and screens while keeping the floor bright.
- 02
Studios
Dimming, blackout or privacy fabric depending on the classes held in the room, on controls an instructor can reach.
- 03
Changing and treatment
Privacy from outside and from corridors, with fabrics that stand up to ventilation and daily cleaning.
- 04
Pool and humid areas
Moisture-resistant materials and mechanisms, chosen before anything is shortlisted, so nothing corrodes or warps.
Find your look
Gyms and leisure centres: settings and finishes.
Explore window treatments in settings like yours. Open an image to compare the product, room layout and light control, then discuss the specification at survey.
Room inspiration images illustrate possible settings. BBS installation photos are labelled and project records are linked separately. Products, fabrics and controls are confirmed at survey.
View BBS commercial projectsProcurement
Member comfort and maintenance, both covered
Tell us about opening hours, cleaning blocks and the wet and dry zones. We choose fabrics and mechanisms that suit each one and bring the evidence your operator or landlord asks for.
- 01
Asbestos control
The asbestos register is checked at induction before any drilling. Work stops if textured coatings, casings or other materials are unconfirmed.
- 02
Dust and RPE
On-tool HEPA extraction is carried for masonry drilling. Operatives using P3 RPE were face fit tested in July 2026.
- 03
Access equipment
EN 131 professional step ladders are inspected and tagged through the access equipment log.
- 04
Working at height
Two operatives attend: one at height and one acting as the ground-level safety observer.
- 05
Child safety
BS EN 13120 child safety devices are fitted and adjusted on every unit.
- 06
Contract fabrics
Yewdale contract fabrics certified to BS 5867 Part 2 Type B, with the certificate for the specified fabric supplied on every commercial order. A Type C certified fabric is available where the specification calls for it.
- 07
Document control
The site pack references training matrix BBS-TM-001, tool register BBS-TL-001 and dust and RPE rule BBS-COSHH-003.
Verified credentials
Approved, insured and ready for your site
The essentials are visible here. Open the full record for insurance, training, access and site controls.
Add requirements to your enquiryQualified site team
Enhanced DBS across the fitting team
RAMS supplied as standard before works begin
View full compliance details Insurance, training, access and site controls
- Public and products liability
- £5,000,000
- Employers' liability
- £10,000,000 for any one claim
- Insurer
- Aviva Insurance Limited
- Valid until 5 February 2027
- Accreditations
- Constructionline Gold, BBSA accredited and Yewdale Kestrel certified installers
- BBSA member page
- Anti-ligature
- Yewdale Kestrel certified installers across the fitting team, renewed annually
- Valid until 24 June 2027
- Site team
- CSCS carded, with our own SSSTS qualified supervision
- Safeguarding
- Enhanced DBS across the fitting team
- Training and access
- IPAF, PASMA, Working at Height, Asbestos Awareness and face fit testing
- Safety management
- Laura Pinder holds IOSH Managing Safely
- Risk assessment and method statement
- RAMS supplied as standard before works begin
- Child safety
- BS EN 13120 devices fitted and adjusted on every unit
- Typical lead time
- 7 to 10 days from survey to installation
Access and programme
We fit around classes and members
We use the timetable to find room groups we can work in, rather than asking for the whole centre to close.
- 01
Zones
Reception, gym floor, studios, changing, pool and staff rooms are taken as separate groups.
- 02
Your timetable
Tell us the classes, cleaning blocks and busiest member periods and we plan around them.
- 03
Working area
Barriers, equipment moves and which rooms stay open are agreed with the duty manager before we start.
- 04
Reopening
Each zone is checked and signed off before it goes back to members.
Questions for this setting
Before you send the brief
What helps with a pool-side enquiry?
Photographs, ventilation details and a clear note of which windows sit inside the humid zone help separate those openings from ordinary dry rooms.
Can studios be treated differently from the gym floor?
Yes. Tell us what happens in each studio and we spec it for that, whether it needs dimming, blackout, privacy or screen visibility.
Are the fabrics wipe clean and fire rated?
Screen and blackout fabrics from the Yewdale contract range are certified to BS 5867 Part 2 Type B, with the certificate supplied on every commercial order, and they wipe down as part of the cleaning routine.
Can you fit outside opening hours?
Yes. We work around your hours, supply RAMS before we start, and typically fit within 7 to 10 days of the survey.
Commercial enquiry
Get a quote for your gym
Two quick questions, then where to send the quote. If you have drawings or a deadline, add them in the optional project detail.
Call 0161 244 9467 Or just ask a quick questionAbout 30 seconds. Your sector is already selected.
Quicker on your phone?
WhatsApp photos of the windows Phone snaps or a schedule, whatever you have