Constructionline Gold and BBSA accredited
Trade accreditationsFor your home
For a business or managed building
School blinds | Manchester and the North West
Blinds for classrooms, halls, offices and shared spaces in schools, colleges and universities, surveyed and fitted around the academic calendar by an Enhanced DBS team.
Proven in education
See three completed education projects, with the building and fitting detail set out in each case study.
See all commercial work
Room by room
Start with what each room needs to do. We will help narrow the blind, fabric and control options at survey stage.
Glare control for screens while keeping useful daylight.
Blackout or dimming where full light control is needed.
Privacy, screen comfort and a finish suited to daily use.
Manual, wand-operated or motorised options, chosen around access and use.
Procurement
Tell us what your procurement team needs before work can start. Current evidence is shown and supplied only when it has been confirmed.
Enhanced DBS across the fitting team, CSCS carded, with our own SSSTS qualified supervision.
The asbestos register is checked at induction before any drilling. Work stops if textured coatings, casings or other materials are unconfirmed.
On-tool HEPA extraction is carried for masonry drilling. Operatives using P3 RPE were face fit tested in July 2026.
EN 131 professional step ladders are inspected and tagged. Work at height uses two operatives, with one acting as the ground-level safety observer.
BS EN 13120 child safety devices are fitted and adjusted on every unit.
Yewdale contract fabrics certified to BS 5867 Part 2 Type B, with the certificate for the specified fabric supplied on every commercial order. A Type C certified fabric is available where the specification calls for it.
The site pack references training matrix BBS-TM-001, tool register BBS-TL-001 and dust and RPE rule BBS-COSHH-003.
Verified credentials
The essentials are visible here. Open the full record for insurance, training, access and site controls.
Add requirements to your enquiry
Constructionline Gold and BBSA accredited
Trade accreditationsQualified site team
Enhanced DBS across the fitting team
RAMS supplied as standard before works begin
Access and programme
Give us the dates and access limits early. We can shape the survey and fitting plan around the live building.
Half term, holidays, weekends or an occupied-school programme.
Classrooms, halls, offices and specialist spaces, grouped by priority.
A room list, window schedule or drawings can be attached to the enquiry.
Survey, product choices, access and fitting sequence recorded before work starts.
Questions for this setting
Include the holiday dates, permitted hours and any rooms that remain in use. The programme can then be assessed against the actual room groups and scope.
Tell us which way the windows face, where the screens are and what time of day the glare hits. The survey then looks at useful daylight as well as screen visibility.
Yes. Worsley College had its training rooms and multi-window walls fitted over the summer break, around equipment that stays set up all year. Campus work is planned the same way: term dates, room groups and Enhanced DBS across the fitting team.
Insurance certificates (£5,000,000 public and £10,000,000 employers' liability), Enhanced DBS across the fitting team, a project specific RAMS before we start, BS EN 13120 child safety devices on every blind, and the fire certificate for the specified fabric.
Commercial enquiry
Start with the site count, rough window count and programme. Drawings and window schedules can be attached at the final step.
Call 0161 244 9467 Discuss the site briefAbout 90 seconds. Your sector is already selected.
One site, one office or one shop? Skip the form.
WhatsApp the window count A photo of the windows helps