Constructionline Gold, BBSA accredited and Yewdale Kestrel certified installers
Trade accreditations
Facilities management blinds | Manchester and the North West
Blind maintenance and replacement for occupied estates
Tell us which rooms need doing. BBS helps facilities teams sort urgent repairs, whole-floor replacements and visits to several buildings, then sends back photos and snags.
- Brief
- What is broken, where and how soon
- Survey
- Schools, offices and occupied sites
- Handover
- Photos, actions and snags for your team
Proven for managed estates
Evidence from a live estate programme
The SPIE Facilities case study records reactive blind maintenance across forty school sites, where the useful outcome was a coordinated response across occupied buildings rather than a single installation.
See all commercial work
Room by room
Tell us which rooms need doing
Tell us what's broken before we talk fabrics. It saves a visit.
- 01
What's broken
Tell us the site, the room, the blind and what is wrong with it.
- 02
Whole floors or rooms
Where several need replacing, we do them by building or floor so the visit count stays low.
- 03
Getting in
Tell us about escorts, inductions, pupil or resident access and rooms that must stay open.
- 04
What you get back
We send photos, completed actions, snags and the next recommendation.
Find your look
Facilities management: settings and finishes.
Explore window treatments in settings like yours. Open an image to compare the product, room layout and light control, then discuss the specification at survey.
Room inspiration images illustrate possible settings. BBS installation photos are labelled and project records are linked separately. Products, fabrics and controls are confirmed at survey.
View BBS commercial projectsProcurement
What we need before we visit
Send the client brief, site rules and room list before we visit. We can then focus on the windows and the people using the building.
- 01
The job
Send the room list, ticket reference, priority and any photos you already have.
- 02
Site rules
Tell us about approvals, inductions, RAMS, escorts or permits at each building.
- 03
Blind record
Note the blind type, control, approximate age and whether it needs repairing or replacing.
- 04
What we hand over
Tell us who needs photos, completed actions, snags and recommendations.
Contract delivery evidence
What we hand over when the job is done
The useful proof for a managed estate is practical: insurance, site competence, RAMS, photos and snags your team can pass back to the client.
Add requirements to your enquiryQualified site team
Enhanced DBS across the fitting team
RAMS supplied as standard before works begin
View full compliance details Insurance, competence, RAMS and handover evidence
- Public and products liability
- £5,000,000
- Employers' liability
- £10,000,000 for any one claim
- Accreditations
- Constructionline Gold, BBSA accredited and Yewdale Kestrel certified installers
- BBSA member page
- Site team
- CSCS carded, with our own SSSTS qualified supervision
- Safeguarding
- Enhanced DBS across the fitting team
- Training and access
- IPAF, PASMA, Working at Height, Asbestos Awareness and face fit testing
- Safety management
- Laura Pinder holds IOSH Managing Safely
- Risk assessment and method statement
- RAMS supplied as standard before works begin
- Typical lead time
- 7 to 10 days from survey to installation
Access and programme
Sort the work into a sensible plan
Tell us which jobs are urgent, which rooms can be done together and what you need back afterwards.
- 01
Urgent first
Separate safety issues, lost use and cosmetic faults.
- 02
Group by floor
We batch buildings, floors or matching windows that can be done in one visit.
- 03
Keys and escorts
Tell us about keys, escorts, inductions, holiday access and rooms that must stay open.
- 04
Photos back to you
We send photos, actions, snags and replacement recommendations in the agreed format.
Questions for this setting
Before you send the brief
What should an FM team send with a reactive blind ticket?
Give the site, room, existing blind type, visible fault, urgency and any access rule. A photograph and ticket reference help the first response stay focused.
Can one enquiry cover planned and reactive work across an estate?
Yes. Keep urgent repairs, planned replacements and new work in separate groups, then show the sites, priorities and dates that connect them.
What do you need to know about getting into an occupied building?
Tell us about escorts, keys, inductions, resident or pupil access, holiday access, out-of-hours limits and rooms that cannot be taken out of use, and we plan the visit around them.
What can we file for our approved supplier list?
Constructionline Gold, BBSA accredited, public and products liability of £5,000,000 and employers' liability of £10,000,000 with Aviva to 5 February 2027, CSCS carded team with SSSTS supervision, Enhanced DBS across the fitting team, IOSH Managing Safely in the office.
Do you accept purchase orders and framework call offs?
Yes. Add the PO or contract reference under project detail in the enquiry and it follows the job through to invoice. A site specific RAMS comes before each visit, and we attend inductions and pre-start meetings.
Commercial enquiry
Get a quote for your portfolio
Start with a rough window count and the programme. Add sites, drawings, the tender date and access rules in the project detail, and leave anything you do not know yet for the survey.
Call 0161 244 9467 Discuss the site briefAbout 30 seconds. Your sector is already selected.
Quicker on your phone?
WhatsApp photos of the windows Phone snaps or a schedule, whatever you have