Practical roller blinds fitted in a British healthcare consultation room

Healthcare blinds | Manchester and the North West

Blinds for hospitals and healthcare sites

Privacy, cleanable fabrics and controlled daylight for patient, clinical and staff spaces, fitted by an Enhanced DBS team used to live clinical sites.

Patient spaces
Privacy and controlled daylight
Clinical use
Room function drives the specification
Live site
Access agreed around care delivery

Relevant occupied-setting work

Similar care work you can inspect

These care projects show related work in occupied settings where privacy, access and room use matter.

See all commercial work
Healthcare room with wipe-clean roller blinds controlling daylight and privacy Healthcare

Room by room

What we fit in a healthcare setting

Healthcare rooms do not take one generic blind. We fit each room for its purpose, its privacy level and how it is cleaned.

  1. 01

    Contract fabrics

    Yewdale contract fabrics certified to BS 5867 Part 2 Type B, with the certificate for the specified fabric supplied on every commercial order. A Type C certified fabric is available where the specification calls for it.

  2. 02

    Consulting rooms

    Privacy from outside and from the corridor, with adjustable daylight that does not fall across the screen.

  3. 03

    Waiting and circulation

    Glare and heat off the seating without blocking wayfinding or the reception team’s view of the room.

  4. 04

    Treatment spaces

    Wipeable, moisture-resistant fabrics, the privacy level the room needs, and fixings kept clear of any restricted areas.

  5. 05

    Staff and administration

    Screen-friendly light in offices and break rooms, treated as ordinary workplaces.

Procurement

Working on a live clinical site

Tell us which rooms are live, who controls entry and what your infection control or estates team needs to see before we fit. Our fitters are directly employed and Enhanced DBS, and we supply RAMS and insurance as standard.

  1. 01

    Room groups

    Public, patient, treatment, staff and restricted areas are treated as separate groups with their own access and fabric choice.

  2. 02

    Cleaning

    Tell us the approved cleaning method and we choose fabrics that survive it.

  3. 03

    Estates access

    Escorts, permits and inductions are arranged with your estates team before survey and fitting.

  4. 04

    What we bring

    Public liability insurance, RAMS, Enhanced DBS for every fitter and Constructionline Gold, plus certificates for the fabric quoted.

Verified credentials

Approved, insured and ready for your site

The essentials are visible here. Open the full record for insurance, training, access and site controls.

Add requirements to your enquiry
Constructionline Gold Member BBSA accredited member

Constructionline Gold and BBSA accredited

Trade accreditations
£5m Public and products liability
£10m Employers' liability

Qualified site team

Enhanced DBS across the fitting team

RAMS supplied as standard before works begin

View full compliance details Insurance, training, access and site controls
Public and products liability
£5,000,000
Employers' liability
£10,000,000 for any one claim
Insurer
Aviva Insurance Limited
Valid until 5 February 2027
Accreditations
Constructionline Gold and BBSA accredited
Site team
CSCS carded, with our own SSSTS qualified supervision
Safeguarding
Enhanced DBS across the fitting team
Training and access
IPAF, PASMA, Working at Height, Asbestos Awareness and face fit testing
Safety management
Laura Pinder holds IOSH Managing Safely
Risk assessment and method statement
RAMS supplied as standard before works begin
Child safety
BS EN 13120 devices fitted and adjusted on every unit
Typical lead time
7 to 10 days from survey to installation

Access and programme

We protect care delivery while we work

We follow room availability and clinical priority rather than assuming we can go floor by floor.

  1. 01

    Room groups

    Rooms are split by service, access level and when they can be released to us.

  2. 02

    Survey

    Escorts, hygiene measures and how our kit enters each area are agreed with your team first.

  3. 03

    Fitting sequence

    Short room groups planned around appointments, clinics and protected zones, so nothing is left half done.

  4. 04

    Handback

    Your named person checks cleaning, operation and readiness after each group before it returns to use.

Questions for this setting

Before you send the brief

What should an estates team include in the first brief?

A room schedule, privacy requirements, cleaning restrictions, access classification and any evidence needed before survey or fitting are the most useful starting points.

Can live clinical areas be separated from public rooms?

Yes. Live clinical areas are their own access group with their own release times, so the survey and fitting follow the service rather than the building plan.

What does an estates team get before work starts?

A project specific RAMS, the fire certificate for the specified fabric, our insurance certificates (£5,000,000 public and £10,000,000 employers' liability), and Enhanced DBS across the fitting team. We ask for the asbestos register at induction.

Can you fit around live clinical areas?

Yes. Live areas are treated as their own access groups and we phase around them, with two fitters on every visit and the working area kept clear below.

Commercial enquiry

Get a quote for your healthcare site

Start with the site count, rough window count and programme. Drawings and window schedules can be attached at the final step.

Call 0161 244 9467 Discuss the site brief

About 90 seconds. Your sector is already selected.

One site, one office or one shop? Skip the form.

WhatsApp the window count A photo of the windows helps

Commercial enquiry

Tell us about your site

Step 1 of 4. About 90 seconds.

  1. 1Project
  2. 2Size
  3. 3Timing
  4. 4Contact
What kind of building is it?
What kind of project is it?
How big is it?
Number of sites
Approximate window count
Products, if known
Do you need a certified fire retardant fabric?
When, and how do we get in?
Timescale
Specification stage
Access requirements
Tick anything you need from us before we can start
Who do we send the quote to?