Compliance and credentials

Everything your procurement check asks for, on one page.

Insurance, accreditations, who is on site and what they hold, the fabric certificates and the RAMS. Written for the person filling in the supplier form, with the documents ready when you ask.

Credentials we hold

Public and products liability
£5,000,000
Employers' liability
£10,000,000 for any one claim
Insurer
Aviva Insurance LimitedValid to 5 February 2027
Accreditations
Constructionline Gold, BBSA accredited and Yewdale Kestrel certified installersBBSA member page
Anti-ligature
Yewdale Kestrel certified installers across the fitting team, renewed annuallyValid to 24 June 2027
Site team
CSCS carded, with our own SSSTS qualified supervision
Safeguarding
Enhanced DBS across the fitting team
Training and access
IPAF, PASMA, Working at Height, Asbestos Awareness and face fit testing
Safety management
Laura Pinder holds IOSH Managing Safely
Risk assessment and method statement
RAMS supplied as standard before works begin
Child safety
BS EN 13120 devices fitted and adjusted on every unit
Typical lead time
7 to 10 days from survey to installation

Certificates come with the quote, or by return when you ask for them at PQQ stage.

How we work on your site

Fabric and fire
Yewdale contract fabrics certified to BS 5867 Part 2 Type B, with the certificate for the specified fabric supplied on every commercial order. A Type C certified fabric is available where the specification calls for it.
Child safety
Devices to BS EN 13120 are fitted and adjusted on every unit, with chains and cords secured at the correct height. Mandatory in schools, nurseries and care settings.
Fixings and substrate
Self-drilling fixings into aluminium frames. Rated cavity anchors in plasterboard, or hardened screws where a stud is confirmed. Masonry drilling uses on-tool HEPA extraction and face fit tested P3 masks.
Working at height
EN 131 professional access equipment, inspected and tagged before use. Two fitters, one working and one at ground level watching the area below. IPAF and PASMA carded for powered access and towers.
Occupied buildings
We ask to see the asbestos register at induction before anyone drills, and we stop and check rather than guess on any material the register does not cover.
Getting it done
Seven to ten days from survey to fitting, and we work around your hours. Project specific RAMS come to you before we start.

Questions procurement teams ask

What insurance does BBS carry?

Public and products liability of £5,000,000 and employers' liability of £10,000,000 for any one claim, with Aviva Insurance Limited, valid to 5 February 2027. The certificate comes with the quote or on request.

Which accreditations can we file for our approved supplier list?

Constructionline Gold, BBSA accredited, and Yewdale Kestrel certified installers for anti-ligature work. Checkatrade rating 9.83 out of 10, checked 22 August 2026.

Do you supply RAMS before you start?

Yes. A project specific risk assessment and method statement comes to you before works begin, on every commercial job. A redacted example is on this page.

Can you fit anti-ligature products in a mental health setting?

Yes. Our fitters are Yewdale Kestrel certified installers, covering the load release anti-ligature range: window curtain tracks, divider and cubicle tracks, roller blinds and vertical blinds. Certification is held by each installer and renewed annually, and the certificates for the team on your job come with the quote.

Is the fitting team vetted for schools, care homes and healthcare?

Enhanced DBS across the fitting team. CSCS carded, with our own SSSTS qualified supervision, and Laura Pinder holds IOSH Managing Safely.

Are your fabrics fire retardant?

Yewdale contract fabrics certified to BS 5867 Part 2 Type B, with the certificate for the specified fabric supplied on every commercial order. A Type C certified fabric is available where the specification calls for it.

Are the blinds child safe?

Devices to BS EN 13120 are fitted and adjusted on every unit, with chains and cords secured at the correct height. That applies to every blind we fit, not only in schools and nurseries.

Can you work at height and in occupied buildings?

IPAF, PASMA, Working at Height and Asbestos Awareness trained, with face fit testing. We ask to see the asbestos register at induction before anyone drills, and we work around your hours.

What is the lead time, and do you accept purchase orders?

Typically 7 to 10 days from survey to installation. Purchase orders are welcome: add the PO or project reference to the enquiry and it follows the job through to invoice.

In more depth: what to ask a blind fitter before they start on site, what a fire certificate for blind fabric covers and anti-ligature blinds and curtain tracks.

Get a quote for your site

Send the site, the rooms and the dates.

Commercial enquiry

Tell us about your site

Step 1 of 2. About 30 seconds.

  1. 1The job
  2. 2Your details
About the job
What kind of building is it?
Roughly how many windows?
When do you need them?
Where do we send the quote?
Add project detail Optional. Tenders, fire retardant fabric, access, drawings.
What kind of project is it?
Number of sites
Specification stage
Products, if known
Do you need a certified fire retardant fabric?
Access requirements
Tick anything you need from us before we can start