Constructionline Gold and BBSA accredited
Trade accreditationsFor your home
For a business or managed building
Hotel blinds | Manchester and the North West
One spec repeated across every guest room, properly dark, and a different conversation for reception, dining and function rooms.
Relevant hospitality work
These visitor and residential projects show related work where guest comfort, appearance and access matter.
See all commercial work
Room by room
Bedrooms need the same blind repeated well and properly dark. Reception, dining and function rooms need a different conversation about light, view and finish.
Blackout that actually blacks out, a daytime layer for privacy, and one spec repeated across every room type.
Fabric and blind style chosen to sit with the interior scheme and the sight lines guests see on arrival.
Light control that changes with the day, from breakfast glare to evening events and presentations.
Practical, easy-clean blinds for offices, stores and staff rooms.
Procurement
Tell us the room types, the public areas, who approves the sample room and how occupancy is released. We turn that into one spec and one supplier for the whole building.
Tell us the bedroom types and quantities, and any windows that break the standard layout, and we build the spec from that.
One sample room, signed off by whoever approves fabrics, lining and hardware, before the roll-out.
Rooms out of service, housekeeping access and guest-facing work zones are planned with the front desk.
Public liability insurance, RAMS, Enhanced DBS for every fitter and Constructionline Gold, sent as one pack when you ask.
Verified credentials
The essentials are visible here. Open the full record for insurance, training, access and site controls.
Add requirements to your enquiry
Constructionline Gold and BBSA accredited
Trade accreditationsQualified site team
Enhanced DBS across the fitting team
RAMS supplied as standard before works begin
Access and programme
Room blocks, housekeeping access and public-area closures are planned as one sequence from survey to sign-off.
Standard rooms, suites and exceptions are grouped before we survey.
We fit one room first so the finish is checked before the rest go in.
Tell us the room blocks, housekeeping windows and quiet periods for public areas and we work to them.
Each room is checked, reset and returned to housekeeping ready to let.
Questions for this setting
Yes. We fit one representative room first, get it signed off by whoever approves the finish, and roll the same spec out. Any differences between room types stay visible in the final spec.
Provide room-release groups and housekeeping access periods. This gives the programme a practical basis without assuming a whole floor can close at once.
Yewdale blackout fabrics are certified to BS 5867 Part 2 Type B, with the certificate for the specified fabric supplied on every commercial order. A Type C certified fabric is available where the specification calls for it.
Yes. Give us room release groups and housekeeping windows, and each phase runs at 7 to 10 days from survey to fitting with RAMS supplied before the first room.
Commercial enquiry
Start with the site count, rough window count and programme. Drawings and window schedules can be attached at the final step.
Call 0161 244 9467 Discuss the site briefAbout 90 seconds. Your sector is already selected.
One site, one office or one shop? Skip the form.
WhatsApp the window count A photo of the windows helps