Blackout curtains and sheer blinds fitted in a British hotel bedroom

Hotel blinds | Manchester and the North West

Blinds and curtains for hotels

One spec repeated across every guest room, properly dark, and a different conversation for reception, dining and function rooms.

Guest rooms
Privacy and sleeping light control
Public spaces
A finish shaped around the interior
Occupancy
Room release built into the programme

Relevant hospitality work

Similar venue work you can inspect

These visitor and residential projects show related work where guest comfort, appearance and access matter.

See all commercial work
Hotel bedroom window dressed with privacy sheers and blackout curtains Hotels and hospitality

Room by room

Guest rooms and public spaces, fitted differently

Bedrooms need the same blind repeated well and properly dark. Reception, dining and function rooms need a different conversation about light, view and finish.

  1. 01

    Guest bedrooms

    Blackout that actually blacks out, a daytime layer for privacy, and one spec repeated across every room type.

  2. 02

    Reception and lounge

    Fabric and blind style chosen to sit with the interior scheme and the sight lines guests see on arrival.

  3. 03

    Dining and function

    Light control that changes with the day, from breakfast glare to evening events and presentations.

  4. 04

    Back of house

    Practical, easy-clean blinds for offices, stores and staff rooms.

Procurement

One controlled spec across the hotel

Tell us the room types, the public areas, who approves the sample room and how occupancy is released. We turn that into one spec and one supplier for the whole building.

  1. 01

    Room types

    Tell us the bedroom types and quantities, and any windows that break the standard layout, and we build the spec from that.

  2. 02

    Design sign-off

    One sample room, signed off by whoever approves fabrics, lining and hardware, before the roll-out.

  3. 03

    Occupancy

    Rooms out of service, housekeeping access and guest-facing work zones are planned with the front desk.

  4. 04

    What we bring

    Public liability insurance, RAMS, Enhanced DBS for every fitter and Constructionline Gold, sent as one pack when you ask.

Verified credentials

Approved, insured and ready for your site

The essentials are visible here. Open the full record for insurance, training, access and site controls.

Add requirements to your enquiry
Constructionline Gold Member BBSA accredited member

Constructionline Gold and BBSA accredited

Trade accreditations
£5m Public and products liability
£10m Employers' liability

Qualified site team

Enhanced DBS across the fitting team

RAMS supplied as standard before works begin

View full compliance details Insurance, training, access and site controls
Public and products liability
£5,000,000
Employers' liability
£10,000,000 for any one claim
Insurer
Aviva Insurance Limited
Valid until 5 February 2027
Accreditations
Constructionline Gold and BBSA accredited
Site team
CSCS carded, with our own SSSTS qualified supervision
Safeguarding
Enhanced DBS across the fitting team
Training and access
IPAF, PASMA, Working at Height, Asbestos Awareness and face fit testing
Safety management
Laura Pinder holds IOSH Managing Safely
Risk assessment and method statement
RAMS supplied as standard before works begin
Child safety
BS EN 13120 devices fitted and adjusted on every unit
Typical lead time
7 to 10 days from survey to installation

Access and programme

Rooms back in service without losing control

Room blocks, housekeeping access and public-area closures are planned as one sequence from survey to sign-off.

  1. 01

    Room types

    Standard rooms, suites and exceptions are grouped before we survey.

  2. 02

    Sample room

    We fit one room first so the finish is checked before the rest go in.

  3. 03

    Release

    Tell us the room blocks, housekeeping windows and quiet periods for public areas and we work to them.

  4. 04

    Handover

    Each room is checked, reset and returned to housekeeping ready to let.

Questions for this setting

Before you send the brief

Can one sample room lead the wider package?

Yes. We fit one representative room first, get it signed off by whoever approves the finish, and roll the same spec out. Any differences between room types stay visible in the final spec.

How should occupied rooms be planned?

Provide room-release groups and housekeeping access periods. This gives the programme a practical basis without assuming a whole floor can close at once.

Are blackout fabrics certified for contract use?

Yewdale blackout fabrics are certified to BS 5867 Part 2 Type B, with the certificate for the specified fabric supplied on every commercial order. A Type C certified fabric is available where the specification calls for it.

Can rooms be done in phases around occupancy?

Yes. Give us room release groups and housekeeping windows, and each phase runs at 7 to 10 days from survey to fitting with RAMS supplied before the first room.

Commercial enquiry

Get a quote for your hotel

Start with the site count, rough window count and programme. Drawings and window schedules can be attached at the final step.

Call 0161 244 9467 Discuss the site brief

About 90 seconds. Your sector is already selected.

One site, one office or one shop? Skip the form.

WhatsApp the window count A photo of the windows helps

Commercial enquiry

Tell us about your site

Step 1 of 4. About 90 seconds.

  1. 1Project
  2. 2Size
  3. 3Timing
  4. 4Contact
What kind of building is it?
What kind of project is it?
How big is it?
Number of sites
Approximate window count
Products, if known
Do you need a certified fire retardant fabric?
When, and how do we get in?
Timescale
Specification stage
Access requirements
Tick anything you need from us before we can start
Who do we send the quote to?