Constructionline Gold, BBSA accredited and Yewdale Kestrel certified installers
Trade accreditations
Hotel blinds | Manchester and the North West
Blinds and curtains for hotels
One spec repeated across every guest room, properly dark, and a different conversation for reception, dining and function rooms.
- Guest rooms
- Privacy and sleeping light control
- Public spaces
- A finish shaped around the interior
- Occupancy
- Room release built into the programme
Relevant hospitality work
Similar venue work you can inspect
These visitor and residential projects show related work where guest comfort, appearance and access matter.
See all commercial work
Room by room
Guest rooms and public spaces, fitted differently
Bedrooms need the same blind repeated well and properly dark. Reception, dining and function rooms need a different conversation about light, view and finish.
- 01
Guest bedrooms
Blackout that actually blacks out, a daytime layer for privacy, and one spec repeated across every room type.
- 02
Reception and lounge
Fabric and blind style chosen to sit with the interior scheme and the sight lines guests see on arrival.
- 03
Dining and function
Light control that changes with the day, from breakfast glare to evening events and presentations.
- 04
Back of house
Practical, easy-clean blinds for offices, stores and staff rooms.
Find your look
Hotels and hospitality: settings and finishes.
Explore window treatments in settings like yours. Open an image to compare the product, room layout and light control, then discuss the specification at survey.
Room inspiration images illustrate possible settings. BBS installation photos are labelled and project records are linked separately. Products, fabrics and controls are confirmed at survey.
View BBS commercial projectsProcurement
One controlled spec across the hotel
Tell us the room types, the public areas, who approves the sample room and how occupancy is released. We turn that into one spec and one supplier for the whole building.
- 01
Room types
Tell us the bedroom types and quantities, and any windows that break the standard layout, and we build the spec from that.
- 02
Design sign-off
One sample room, signed off by whoever approves fabrics, lining and hardware, before the roll-out.
- 03
Occupancy
Rooms out of service, housekeeping access and guest-facing work zones are planned with the front desk.
- 04
What we bring
Public liability insurance, RAMS, Enhanced DBS for every fitter and Constructionline Gold, sent as one pack when you ask.
Verified credentials
Approved, insured and ready for your site
The essentials are visible here. Open the full record for insurance, training, access and site controls.
Add requirements to your enquiryQualified site team
Enhanced DBS across the fitting team
RAMS supplied as standard before works begin
View full compliance details Insurance, training, access and site controls
- Public and products liability
- £5,000,000
- Employers' liability
- £10,000,000 for any one claim
- Insurer
- Aviva Insurance Limited
- Valid until 5 February 2027
- Accreditations
- Constructionline Gold, BBSA accredited and Yewdale Kestrel certified installers
- BBSA member page
- Anti-ligature
- Yewdale Kestrel certified installers across the fitting team, renewed annually
- Valid until 24 June 2027
- Site team
- CSCS carded, with our own SSSTS qualified supervision
- Safeguarding
- Enhanced DBS across the fitting team
- Training and access
- IPAF, PASMA, Working at Height, Asbestos Awareness and face fit testing
- Safety management
- Laura Pinder holds IOSH Managing Safely
- Risk assessment and method statement
- RAMS supplied as standard before works begin
- Child safety
- BS EN 13120 devices fitted and adjusted on every unit
- Typical lead time
- 7 to 10 days from survey to installation
Access and programme
Rooms back in service without losing control
Room blocks, housekeeping access and public-area closures are planned as one sequence from survey to sign-off.
- 01
Room types
Standard rooms, suites and exceptions are grouped before we survey.
- 02
Sample room
We fit one room first so the finish is checked before the rest go in.
- 03
Release
Tell us the room blocks, housekeeping windows and quiet periods for public areas and we work to them.
- 04
Handover
Each room is checked, reset and returned to housekeeping ready to let.
Questions for this setting
Before you send the brief
Can one sample room lead the wider package?
Yes. We fit one representative room first, get it signed off by whoever approves the finish, and roll the same spec out. Any differences between room types stay visible in the final spec.
How should occupied rooms be planned?
Provide room-release groups and housekeeping access periods. This gives the programme a practical basis without assuming a whole floor can close at once.
Are blackout fabrics certified for contract use?
Yewdale blackout fabrics are certified to BS 5867 Part 2 Type B, with the certificate for the specified fabric supplied on every commercial order. A Type C certified fabric is available where the specification calls for it.
Can rooms be done in phases around occupancy?
Yes. Give us room release groups and housekeeping windows, and each phase runs at 7 to 10 days from survey to fitting with RAMS supplied before the first room.
Commercial enquiry
Get a quote for your hotel
Two quick questions, then where to send the quote. If you have drawings or a deadline, add them in the optional project detail.
Call 0161 244 9467 Or just ask a quick questionAbout 30 seconds. Your sector is already selected.
Quicker on your phone?
WhatsApp photos of the windows Phone snaps or a schedule, whatever you have