Constructionline Gold, BBSA accredited and Yewdale Kestrel certified installers
Trade accreditations
Office blinds | Manchester and the North West
Blinds for offices and working floors
Screen fabric that takes the glare off monitors and keeps the view, privacy for meeting rooms, and fitting that does not stop the floor working.
- Workstations
- Screen glare and useful daylight
- Meeting rooms
- Privacy and presentation light
- Live offices
- Phases planned around the floor
Proven in offices
Office work you can inspect
Published BBS installations from offices in Radcliffe, Salford, Canary Wharf and beyond, with the project record available for each.
See all commercial workRoom by room
What we fit on an office floor
Sun-facing desks, meeting rooms, reception and circulation each want a different blind. We fit by task and orientation rather than giving every window the same answer.
- 01
Open-plan desks
Screen fabric that cuts glare on monitors and keeps the floor bright and the view outside.
- 02
Meeting rooms
Privacy from the floor, and dim-out where video calls and presentations need the screen readable.
- 03
Reception and breakout
Blinds chosen to sit with the interior finish and the impression visitors get on arrival.
- 04
High or awkward windows
Motorised or grouped control where access is difficult, so nobody is on a ladder with a chain.
Find your look
Offices: settings and finishes.
Explore window treatments in settings like yours. Open an image to compare the product, room layout and light control, then discuss the specification at survey.
Room inspiration images illustrate possible settings. BBS installation photos are labelled and project records are linked separately. Products, fabrics and controls are confirmed at survey.
View BBS commercial projectsProcurement
Fitting into a fit-out or a live floor
Tell us whether the floor is new, occupied or being refurbished, who owns the spec and what the main contractor needs from us. We have fitted DWP, NWAS and Money Wellness without stopping the office working, and about 200 blinds into a two-floor fit-out at Canary Wharf around the furniture, flooring and cleaning crews.
- 01
Drawings
Send the floor plan, elevations or window schedule if the project team has them, and we survey the rest.
- 02
Spec owner
We work to whoever owns the spec, facilities manager, contractor, architect or designer, and get sign-off from them.
- 03
Occupied areas
Work zones, desk moves, security restrictions and quiet periods are planned with facilities so the floor keeps working.
- 04
What we bring
Public liability insurance, RAMS, Enhanced DBS for every fitter and Constructionline Gold, sent as one pack when you ask.
Verified credentials
Approved, insured and ready for your site
The essentials are visible here. Open the full record for insurance, training, access and site controls.
Add requirements to your enquiryQualified site team
Enhanced DBS across the fitting team
RAMS supplied as standard before works begin
View full compliance details Insurance, training, access and site controls
- Public and products liability
- £5,000,000
- Employers' liability
- £10,000,000 for any one claim
- Insurer
- Aviva Insurance Limited
- Valid until 5 February 2027
- Accreditations
- Constructionline Gold, BBSA accredited and Yewdale Kestrel certified installers
- BBSA member page
- Anti-ligature
- Yewdale Kestrel certified installers across the fitting team, renewed annually
- Valid until 24 June 2027
- Site team
- CSCS carded, with our own SSSTS qualified supervision
- Safeguarding
- Enhanced DBS across the fitting team
- Training and access
- IPAF, PASMA, Working at Height, Asbestos Awareness and face fit testing
- Safety management
- Laura Pinder holds IOSH Managing Safely
- Risk assessment and method statement
- RAMS supplied as standard before works begin
- Child safety
- BS EN 13120 devices fitted and adjusted on every unit
- Typical lead time
- 7 to 10 days from survey to installation
Access and programme
Through the floor without stopping work
We work zone by zone so facilities, the fit-out contractor and the people still at their desks all know what is happening.
- 01
Zones
Desks, meeting rooms, reception and restricted areas are taken as separate groups.
- 02
Survey access
Escorts, desk clearance and when each zone can be measured are agreed with facilities.
- 03
Fitting sequence
Room groups are lined up with occupation, other trades and the wider programme.
- 04
Sign-off
Operation and any snags are checked by zone before the area goes back to normal use.
Questions for this setting
Before you send the brief
Can drawings be used for an early budget?
Yes. Send the current floor plan and window schedule and tell us which dimensions are confirmed. We can budget from that, and we still measure before manufacture.
What helps you fix screen glare?
Tell us which way the windows face, where the screens sit and when the glare is worst. That gets a better answer than one generic anti-glare fabric on every elevation. Faith in Nature at Radcliffe is a recent example: screen fabric rollers specified to kill glare and keep the ambient light.
Do you supply RAMS and fit outside office hours?
Yes. A project specific RAMS comes before we start, and we work around your hours so desks are not disturbed. IPAF and PASMA carded for higher glazing.
What is the lead time for an office fit out, and do you take purchase orders?
Typically 7 to 10 days from survey to installation. Purchase orders are welcome: add the PO or project reference under project detail in the enquiry and it follows the job through to invoice.
Commercial enquiry
Get a quote for your office
Two quick questions, then where to send the quote. If you have drawings or a deadline, add them in the optional project detail.
Call 0161 244 9467 Or just ask a quick questionAbout 30 seconds. Your sector is already selected.
Quicker on your phone?
WhatsApp photos of the windows Phone snaps or a schedule, whatever you have