Blackout roller blind fitted in Frederick Street student accommodation

Commercial project · Frederick Street, Salford, M6 6JN

Frederick Street student accommodation blinds

Blackout PVC roller blinds fitted across more than eighty student flats during a two-day new-build programme.

Project
Frederick Street
Setting
Student flats
Location
Salford, M6 6JN

Project facts

The job at a glance.

Project
Frederick Street
Setting
Student flats
Location
Salford, M6 6JN
Product
Blackout PVC rollers
Scale
More than 80 flats
Installation
Two days

The brief

What the site needed.

A new student accommodation block on Frederick Street in Salford needed a consistent blackout solution across more than eighty flats.

BBS supplied chain-operated blackout PVC roller blinds and completed the main installation over two days.

What we did

A specification shaped around the setting.

  1. 01

    Window treatment

    Blackout PVC roller blinds for the accommodation windows.

  2. 02

    Operation

    Chain-operated systems for straightforward resident use.

  3. 03

    Scale

    A coordinated package covering more than eighty flats.

Working on site

Planned around the building, not just the windows.

  1. 01

    Organise

    Blinds were grouped around the flat schedule before installation.

  2. 02

    Fit

    The teams worked through the new accommodation block over two days.

  3. 03

    Check

    Operation and finish were reviewed across the completed areas.

The result

What changed for the space.

The accommodation gained a consistent blackout treatment across more than eighty flats within a compact installation programme.

  • Resident privacy and blackout control
  • Consistent product across the building
  • Installation completed in two days

Commercial enquiry

Get a quote for work like this.

Tell us the setting, approximate window count and programme. We have already selected the closest project type and size from this case study.

Call 0161 244 9467 Discuss the site brief WhatsApp your site details Send photos, a schedule or the first question

About 90 seconds. Known project context is already selected.

Commercial enquiry

Tell us about your site

Step 1 of 4. About 90 seconds.

  1. 1Project
  2. 2Size
  3. 3Timing
  4. 4Contact
What kind of building is it?
What kind of project is it?
How big is it?
Number of sites
Approximate window count
Products, if known
Do you need a certified fire retardant fabric?
When, and how do we get in?
Timescale
Specification stage
Access requirements
Tick anything you need from us before we can start
Who do we send the quote to?