Commercial project · Sheffield
Brockwood Park apartment blinds in Sheffield
Roller and vertical blinds fitted across seventeen flats and apartments created within a converted former school.
- Project
- Brockwood Park
- Setting
- Converted school
- Location
- Sheffield
Project facts
The job at a glance.
- Project
- Brockwood Park
- Setting
- Converted school
- Location
- Sheffield
- Homes
- 17 apartments
- Products
- Roller and vertical blinds
- Glazing
- Tall windows
The brief
What the site needed.
Brockwood Park transformed an old school into seventeen flats and apartments. The conversion retained tall windows, so the window treatment needed to respond to both the unusual glazing and residential room use.
BBS used roller and vertical blind systems, with blackout treatments in bedrooms and dimout options in living spaces.
What we did
A specification shaped around the setting.
- 01
Bedrooms
Blackout roller blinds for privacy and light control.
- 02
Living spaces
Dimout treatments selected for daytime comfort.
- 03
Window form
Roller and vertical systems used around tall converted-school glazing.
Working on site
Planned around the building, not just the windows.
- 01
Survey conversion
The different window proportions in the converted building were measured.
- 02
Match room use
Blackout and dimout options were allocated to bedrooms and living areas.
- 03
Fit apartments
The blind package was installed across all seventeen homes.
The result
What changed for the space.
The conversion gained window treatments suited to both the unusually tall glazing and the different privacy needs of bedrooms and living spaces.
- Blackout control in bedrooms
- Softer daylight in living spaces
- Product choice suited to tall glazing
Commercial enquiry
Get a quote for work like this.
Tell us the setting, approximate window count and programme. We have already selected the closest project type and size from this case study.
Call 0161 244 9467 Discuss the site brief WhatsApp your site details Send photos, a schedule or the first questionAbout 90 seconds. Known project context is already selected.