Navy roller blind half lowered over an apartment window at Cale Cross with a high view across Newcastle and the railway viaduct

Commercial project · Cale Cross, Newcastle

241 apartments at Cale Cross for Oak Construction

Curtains and roller blinds to around 241 apartments over 17 floors, plus the cinema room and private dining, supplied and fitted for Oak Construction.

Client
Oak Construction
Setting
Residential scheme
Location
Cale Cross, Newcastle

Project facts

The job at a glance.

Client
Oak Construction
Setting
Residential scheme
Location
Cale Cross, Newcastle
Apartments
Approximately 241, over 17 floors
Scope
Every apartment plus the amenity spaces
Dark grey curtains hung across the corner glazing of an apartment at Cale Cross in Newcastle

The brief

What the site needed.

Cale Cross is a 17-floor residential building in Newcastle, delivered for Oak Construction. BBS supplied and fitted the window dressings for the whole scheme, from the apartments to the shared amenity spaces.

Around 241 apartments were supplied and fitted with curtains and roller blinds, floor by floor to the top of the building. The amenity spaces were curtained throughout, so the cinema room and the private dining are finished to the same standard as the homes above them.

A scheme this size is a sequencing job as much as a fitting job. Floors finish at different times, so measuring, manufacture and fitting are planned around the contractor’s programme rather than in one visit. That is the part worth knowing if you are the one holding the programme for a large block.

What we did

A specification shaped around the setting.

  1. 01

    Apartments

    Curtains and roller blinds were fitted to approximately 241 apartments across 17 floors.

  2. 02

    Amenity spaces

    Curtains were fitted throughout the shared amenity spaces, including the cinema room and private dining.

Resident lounge at Cale Cross with curtains drawn behind yellow armchairs and a dining table Curtains / Roller blinds

Working on site

Planned around the building, not just the windows.

  1. 01

    Measure to the programme

    Apartments were measured as floors were handed over, so blinds and curtains arrived in the order the building was finished.

  2. 02

    Work the building

    Apartments were covered floor by floor across all 17 floors.

  3. 03

    Finish the shared spaces

    The amenity spaces were curtained to the same standard as the homes above them.

The result

What changed for the space.

Around 241 apartments over 17 floors were supplied and fitted with curtains and roller blinds, and the amenity spaces were curtained throughout, delivered for Oak Construction.

  • Around 241 apartments finished across 17 floors
  • One supplier for curtains and roller blinds across the whole scheme
  • Cinema room and private dining curtained alongside the homes

Commercial enquiry

Get a quote for work like this.

Tell us the setting, approximate window count and programme. We have already selected the closest project type and size from this case study.

Call 0161 244 9467 Discuss the site brief WhatsApp your site details Send photos, a schedule or the first question

About 90 seconds. Known project context is already selected.

Commercial enquiry

Tell us about your site

Step 1 of 4. About 90 seconds.

  1. 1Project
  2. 2Size
  3. 3Timing
  4. 4Contact
What kind of building is it?
What kind of project is it?
How big is it?
Number of sites
Approximate window count
Products, if known
Do you need a certified fire retardant fabric?
When, and how do we get in?
Timescale
Specification stage
Access requirements
Tick anything you need from us before we can start
Who do we send the quote to?